Solar Install

DIY solar seems to be a perfect match for me. The designer at Go Green Solar did the panel layout and it looked fine to me. As I discovered, the problem was that the panels were later out in several sub-arrays on my roof to try and capture the best sunlight. Why is this a problem. Conduit. I had to run sooo much extra conduit. This was, by far, the most time consuming part of the entire project.

The Quick Mount PV flashing/mounts for panels and conduit did make the job of putting everything on the roof easier.

Go Green Solar didn’t provide the roof penetration flashing

https://smile.amazon.com/gp/aw/d/B000DZGLH8?psc=1&ref=yo_pop_mb_pd_title

I ended up getting the conduit mounts here

https://www.elvessupply.com/Quick-Mount-QMCC-A-12-Quik-Conduit-Mnt-Mill_p_2233472.html